
Add to Cart
Ground Clearance of 230mm and KJC-3 3 Cubic Meter Volume Concrete Mixer Truck for Underground Mining
Our company has developed and produced the KJC-3 mining concrete mixer truck that is specifically designed to be used in non coal mine underground tunnels alongside the construction and hardening process. This incredible vehicle aims to solve the shortcomings of traditional tunnel construction methods by providing a more efficient and simplified process.
The KJC-3 is capable of achieving integrated operations of concrete loading, transportation, and unloading from the well to the underground construction surface. The novel design, along with its reasonable structure, ensures stability during operation - providing an economical and practical solution.
This mixer truck's performance parameters have been optimized to meet the demands of non coal mining environments.
An emergency response plan has been established to address issues that arise during the operation of a vehicle. When an unknown fault occurs, the engine may stall and the vehicle may not start normally, causing the mixing tank to cease functioning. If the concrete inside the mixing tank is left for a prolonged period of time, it may solidify and damage the mixing tank rendering it unusable. To prevent this from occurring, our company has added a rescue system to the vehicle's hydraulic system.
The emergency response plan involves the preparation of two rescue high-pressure oil pipes, each with a length of 25-4000mm, as well as one return oil pipe with a length of 4000mm. To carry out a rescue, a vehicle of the same model will be used, and the motor hose on the faulty vehicle will be removed. This hose will then be replaced with a rescue hose that is connected to the hydraulic pump on the rescue vehicle. The rescue vehicle will then remove all the concrete from the mixing tank, ensuring that it is fully cleared.
Model | KJC-3 |
---|---|
Applications | Underground Mining Concrete Mixer |
Deadweight | 9500kg |
Volume | 3 Cubic Meter |
Ground Clearance | 230mm |
Maximum Driving Speed | 25km/h |
Overall Size | 7500×2000×2300mm |
Transmission Type | Hydraulic & Mechanic |
With its hydraulic and mechanical transmission, the KJC-3 is capable of handling heavy loads and challenging terrain with ease. Its maximum driving speed of 25km/h and ground clearance of 230mm make it ideal for navigating difficult underground environments, while its 3 cubic meter volume allows for efficient transport of materials and equipment.
The KJC-3 is certified to ISO9001:2015 standards, ensuring that it meets the highest quality and safety requirements. It is available for purchase with a minimum order quantity of just one unit, and pricing is negotiable depending on your specific needs and requirements. Packaging details include one unit in a 1*40'OT container, and delivery time is approximately 45 working days.
Payment terms include T/T and L/C, and our supply ability for the KJC-3 is 120 units per year, ensuring that we can meet the needs of even the largest mining operations. Whether you're working in coal, metal, or other types of mining, the KJC-3 Underground Mining LHD is the perfect choice for efficient and reliable operations.
So why wait? Contact us today to learn more about the KJC-3 and how it can help you take your underground mining operations to the next level.
The KJC-3 model has a volume of 3 cubic meters and has a transmission type of hydraulic and mechanic. It has a maximum driving speed of 25km/h and is perfect for transporting concrete mixer truck for underground mining. The deadweight of the product is 9500kg, making it sturdy and reliable for long-term use.
Q: What is the brand name of the Underground Mining Equipment?
A: The brand name is POTENTIAL / POTENCY.
Q: What is the model number of the Underground Mining Equipment?
A: The model number is KJC-3.
Q: Where is the Underground Mining Equipment manufactured?
A: The Underground Mining Equipment is manufactured in China.
Q: Does the Underground Mining Equipment have any certifications?
A: Yes, the Underground Mining Equipment is certified with ISO9001:2015.
Q: What is the minimum order quantity for the Underground Mining Equipment?
A: The minimum order quantity is 1 unit.
Q: Is the price of the Underground Mining Equipment negotiable?
A: Yes, the price is negotiable.
Q: What are the packaging details for the Underground Mining Equipment?
A: The packaging details are 1 unit in 1*40'OT.
Q: What is the delivery time for the Underground Mining Equipment?
A: The delivery time is 45 working days.
Q: What are the payment terms for the Underground Mining Equipment?
A: The payment terms are T/T and L/C.
Q: What is the supply ability of the Underground Mining Equipment?
A: The supply ability is 120 units per year.